TY - RPRT TI - Moray East Pre-Construction Survey Campaign Summary Report AU - Moray Offshore Wind Farm (East) Limited AB - This document is being provided in line with the commitment made within the Project Environmental Monitoring Plan (PEMP) (Moray East, 2018) where it is stated that a summary of the pre-construction surveys will be provided upon completion of the analysis of the full pre-construction survey campaign (Section 2.6). The results of the 2010 geophysical and geotechnical surveys have been included within the Moray East Environmental Statement (ES) 2012 and therefore are not referred here. The layout of this document will divide the surveys completed in both the Moray East site and OfTI Corridor for clear representation. CY - Scotland DA - 2019/09// PY - 2019 SP - 19 PB - Moray Offshore Wind Farm (East) Limited UR - https://marine.gov.scot/data/moray-east-offshore-windfarm-project-environmental-monitoring-programme-pemp LA - English KW - Wind Energy KW - Fixed Offshore Wind KW - Habitat Change KW - Fish KW - Invertebrates KW - Physical Environment KW - Sediment Transport KW - Human Dimensions KW - Fisheries ER -